Webvent

Definitive Solar Institute

A community for solar development professionals.

Definitive Solar Institute

EIA-860 Instructions

Existing plants are required to respond to the EIA-860 if:
• The plant’s total generator nameplate capacity is 1 Megawatt (MW) or greater and
• The plant’s generator(s), or the facility in which the generator(s) resides, are connected to
the local or regional grid.

Download Now